reschedule_plan
Change the scheduled time for a plan or step by providing a new ISO 8601 date string to update existing schedules in the PlanManager system.
Instructions
Change the scheduled time for a plan or step.
Args: plan_id: The ID of the item. new_time: New ISO 8601 date string (e.g., "2025-12-25").
Input Schema
TableJSON Schema
| Name | Required | Description | Default |
|---|---|---|---|
| plan_id | Yes | ||
| new_time | Yes |