Skip to main content
Glama

GetEstimatED — South African building cost estimates

Quick building cost estimate (South Africa)

sa_quick_estimate
Read-onlyIdempotent

Ballpark cost to build a house (or an addition) in South Africa from its floor area: low, expected and high in rand, excl. and incl. VAT, from the published rate per m² for the quality class (AECOM Africa Property & Construction Cost Guide 2025/26, private dwelling houses) adjusted for the province. Excludes site works, professional fees, municipal fees and escalation. A first budget figure — a bill of quantities priced for the actual plans is needed for a reliable price.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "floor_area_m2": "<floor_area_m2>"
    },
    "name": "sa_quick_estimate"
  }
}

Input Schema

NameRequiredDescriptionDefault
scopeNoA new house (default) or an addition / alteration to an existing house.
qualityNoQuality class of finishes: economic, standard, middle, luxury, exclusive, super_luxury. Default standard.
provinceNoProvince: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Default Gauteng.
floor_area_m2YesGross floor area in m² (for an addition: the NEW floor area only).

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.3/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover read-only, idempotent, closed-world, non-destructive behavior, and the description goes well beyond them. It discloses the data source and vintage, the province adjustment, and an explicit exclusion list (site works, professional fees, municipal fees, escalation), which materially bounds how the number may be used. It also states the output dimensions (three points, VAT-inclusive and exclusive), so the agent knows what it is quoting.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Roughly three dense sentences, front-loaded with what the tool returns before the caveats. Every element carries information, though the closing bill-of-quantities sentence is the longest and could be tightened without losing meaning.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, so the description must describe the return values, and it does: three cost levels in rand, both VAT-exclusive and inclusive. Combined with the exclusion list and the source citation, an agent has everything needed to call this correctly and to caveat the result.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, but the description adds real meaning: it explains that province adjusts the published rate and that the quality class selects which rate per m² applies, linking the parameters to the mechanism rather than just restating them. Scope and floor-area semantics are left to the schema, which already handles them well.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a specific verb-and-resource combination: a ballpark build cost for a house or addition in South Africa, derived from floor area. It names the underlying source (AECOM Africa Property & Construction Cost Guide 2025/26, private dwelling houses) and the output shape (low/expected/high, excl. and incl. VAT), which separates it from a raw rate lookup. It never names a sibling tool outright, so differentiation is implicit rather than explicit.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The framing 'A first budget figure' plus 'a bill of quantities priced for the actual plans is needed for a reliable price' tells the agent this is for early-stage sanity checking, not final pricing. That is clear when-to-use and implicit when-not guidance, but it stops short of pointing at the concrete alternatives (sa_building_rate_lookup, estimate_from_brief, buy_estimate_pack) that an agent would otherwise have to choose between.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.