Skip to main content
Glama

GetEstimatED — South African building cost estimates

Building rate per unit (South Africa)

sa_building_rate_lookup
Read-onlyIdempotent

Approximate all-in South African building rate for an item of work (materials + labour + plant + contractor margin, excl. VAT) per unit, e.g. "230 mm brick wall" per m², "concrete strip footing" per m³, "IBR roof sheeting" per m², "ceramic floor tiles" per m². Adjusted for the province and, for finish items, the quality class. From GetEstimatED's own rate guide 2026 — a guide for budgeting, not a quotation.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "item": "<item>"
    },
    "name": "sa_building_rate_lookup"
  }
}

Input Schema

NameRequiredDescriptionDefault
itemYesThe work item in plain words, e.g. "plaster to internal walls" or "concrete surface bed 100 mm".
limitNoHow many matching items (1–8, default 5).
qualityNoQuality class of finishes: economic, standard, middle, luxury, exclusive, super_luxury. Default standard.
provinceNoProvince: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Default Gauteng.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly, idempotent, non-destructive and closed-world, so the safety profile is covered. The description adds genuinely useful context beyond that: what the rate includes (materials + labour + plant + contractor margin), that VAT is excluded, the 2026 rate-guide source, and that it is an approximation rather than a quotation. It does not describe response shape or what happens when no item matches, which keeps it below a 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three sentences, front-loaded with the core definition, then the adjustment logic, then the caveat. The example list is long but each example disambiguates the expected item phrasing. No filler or restatement of the title.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a four-parameter read-only lookup with no output schema, the description covers what the tool returns (a per-unit rate, inclusions, VAT exclusion) and the main modifiers. Details like how many results come back are left to the schema's limit parameter, which is acceptable given full schema coverage.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already explains item, limit, quality and province, making 3 the baseline. The description adds some real meaning — that province adjusts the rate and that quality class applies specifically to finish items — which the schema does not state. That is incremental value but not enough to fully override the baseline.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gives a specific verb and resource — an approximate all-in building rate per unit for a work item — and backs it with four concrete examples ("230 mm brick wall" per m², concrete strip footing per m³). An agent can tell this is a per-unit rate lookup rather than an estimate or price index. It stops short of naming a sibling such as sa_material_price_index or sa_quick_estimate, so the boundary with those tools is left implicit.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied by the phrase "a guide for budgeting, not a quotation," which tells the agent the output is indicative and should not be presented as a firm price. However, there is no explicit statement of when to pick this over sa_quick_estimate or sa_material_price_index, nor any preconditions about item phrasing beyond the examples.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.