Skip to main content
Glama

GetEstimatED — South African building cost estimates

Make an estimate from a written brief (preview, then confirm)

estimate_from_brief
Destructive

Makes a new early-stage cost estimate (a priced bill of quantities by Estie, GetEstimatED's estimator) from a written brief — no drawings needed — in a new project in the user's own account. TWO STEPS: the first call changes nothing and returns a preview (what will be priced, province, quality class, and the PRICE in rand — up to about R X, which is also the most they can be charged — against their wallet balance; Pro accounts are unlimited and are not charged from a wallet) plus a confirm_token; only after the user agrees, call again with exactly the same arguments plus confirm_token (valid 10 minutes, single use). The estimate takes a few minutes: the second call returns the project_id — then call get_my_bill to fetch the totals and the PDF / Excel links. The user pays only what the estimate actually costs, at least R15, never more than the price shown; a failed run costs nothing. If the wallet is below the price, nothing runs and top_up_wallet adds money (R100, R250, R500 or R1 000). Very large jobs are refused: split them per building or ask GetEstimatED for a quote. Provinces: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Quality classes: economic, standard, middle, luxury, exclusive, super_luxury. Needs the user's GetEstimatED sign-in (they are asked to sign in the first time).

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "brief": "<brief>",
      "gfa_m2": "<gfa_m2>"
    },
    "name": "estimate_from_brief"
  }
}

Input Schema

NameRequiredDescriptionDefault
townNoTown or suburb (optional, kept on the project).
briefYesThe brief in plain words: what is being built, rooms, finishes, roof, walls, anything special (20–2000 characters).
gfa_m2YesApproximate gross floor area in m² (required).
qualityNoQuality class: economic, standard, middle, luxury, exclusive, super_luxury. Default standard.
storeysNoNumber of storeys (optional).
provinceNoProvince of the site: GP, WC, KZN, EC, FS, LP, MP, NW, NC (or the province name). Default Gauteng.
buildingsNoNumber of separate buildings in the brief (optional, default 1; more than 5 is refused).
project_nameNoName for the new project (optional).
project_typeNoKind of work. Default new_dwelling.
confirm_tokenNoSecond step only: the confirm_token from the preview, after the user agreed.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Changed1 schema field changed
    • addedInput schema / properties / buildings
      Added value: +{
      +  "description": "Number of separate buildings in the brief (optional, default 1; more than 5 is refused).",
      +  "type": "number"
      +}
  2. First observed

TDQS

A4.5/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Far exceeds the annotations (readOnlyHint=false, destructiveHint=true, idempotentHint=false) by disclosing that the first call is a no-op preview, that confirm_token is single-use and expires in 10 minutes, that the second call creates the project and charges the wallet, that charges are capped by the quoted price with a R15 floor, that failures cost nothing, and that the run takes minutes.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The core purpose is front-loaded and the TWO STEPS label is helpful, but the body is one dense run-on paragraph with a literal 'R X' placeholder where a real amount should be, and the price-cap point is restated twice in different wording.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 10-parameter, non-idempotent, money-spending creation tool with no output schema, the description still tells the agent what the preview contains, what the second call returns (project_id), where the totals and PDF/Excel links live, and that sign-in is required. Nothing essential to calling it correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is already 100%, so baseline is 3, but the description adds real meaning beyond the schema: the confirm_token must be passed on the second call with otherwise identical arguments, and it reiterates the province codes, quality classes and the wallet/price coupling that make the required params matter.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and artifact: creates a priced bill of quantities ('early-stage cost estimate') from a written brief, in a new project in the user's own account, with no drawings. It also names the producing entity (Estie by GetEstimatED), so an agent knows exactly what resource is created.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives explicit when-to-use and when-not branches: split very large jobs or ask for a quote, top up the wallet when short, and use get_my_bill afterwards for totals. It clearly explains the two-call protocol and when the second call is warranted (after the user agrees), though it never contrasts itself with the sibling sa_quick_estimate.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.