Get sprint details
get_sprintGet one sprint in full: goal, dates, status, Story Points summary (total / done / remaining, and per status in sp_by_status), the sprint's tasks (text, status, assignee, Story Points, project) and the burndown: one snapshot per day with remaining and completed points, the scope line and the ideal line. 1 Story Point = 1 working day. Use it for 'how is the current sprint going?', 'are we on track?', 'who has what in sprint 12?'. Needs the numeric sprint id from list_sprints. Only tasks from projects the connected user can see are listed (totals cover the whole sprint). Read-only.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"sprint_id": "<sprint_id>"
},
"name": "get_sprint"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| sprint_id | Yes | Numeric sprint id — the `id` field from `list_sprints`. | |
| tasks_limit | No | Maximum number of sprint tasks per page (1–200, default 100). | |
| tasks_cursor | No | Opaque cursor for the next page of this sprint's tasks — the `tasks_next_cursor` value from the previous `get_sprint` response. Omit for the first page. | |
| include_burndown | No | Include the burndown series: one snapshot per day (remaining / completed Story Points) plus the ideal line. Set to false when only the sprint contents are needed. |