Skip to main content
Glama

Get sprint details

get_sprint
Read-onlyIdempotent

Get one sprint in full: goal, dates, status, Story Points summary (total / done / remaining, and per status in sp_by_status), the sprint's tasks (text, status, assignee, Story Points, project) and the burndown: one snapshot per day with remaining and completed points, the scope line and the ideal line. 1 Story Point = 1 working day. Use it for 'how is the current sprint going?', 'are we on track?', 'who has what in sprint 12?'. Needs the numeric sprint id from list_sprints. Only tasks from projects the connected user can see are listed (totals cover the whole sprint). Read-only.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "sprint_id": "<sprint_id>"
    },
    "name": "get_sprint"
  }
}

Input Schema

NameRequiredDescriptionDefault
sprint_idYesNumeric sprint id — the `id` field from `list_sprints`.
tasks_limitNoMaximum number of sprint tasks per page (1–200, default 100).
tasks_cursorNoOpaque cursor for the next page of this sprint's tasks — the `tasks_next_cursor` value from the previous `get_sprint` response. Omit for the first page.
include_burndownNoInclude the burndown series: one snapshot per day (remaining / completed Story Points) plus the ideal line. Set to false when only the sprint contents are needed.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true, idempotentHint=true, and openWorldHint=false, so the safety profile is covered. The description does add real behavioral context beyond them: task visibility is scoped to projects the connected user can see while totals span the whole sprint, and 1 Story Point equals 1 working day. It leaves pagination behavior to the schema, so a 3 fits.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the returned payload and followed by usage examples and prerequisites; every sentence carries information. The opening sentence is dense with stacked parentheticals, which slightly hurts scannability but does not waste words.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, so the description must describe return values, and it does so thoroughly: sprint metadata, Story Points totals broken out by status, task fields, and the burndown's daily snapshots plus ideal and scope lines. Prerequisite, visibility scoping, and units are all covered for a four-parameter read tool.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so sprint_id, tasks_limit, tasks_cursor, and include_burndown are already documented in structured data; baseline is 3. The description adds domain meaning by explaining what the burndown series contains and restating the Story Point unit, but nothing about cursor or limit semantics beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ("Get one sprint in full") and enumerates the payload: goal, dates, status, Story Points summary, tasks, and burndown. It is immediately distinguishable from list_sprints, which is named as the source of the required id.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives concrete triggering questions ("how is the current sprint going?", "who has what in sprint 12?") and states the prerequisite that the numeric sprint id comes from list_sprints. It stops short of saying when to prefer list_sprints or when a single-sprint fetch is unnecessary, so no explicit exclusions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources