Skip to main content
Glama

Schedule or reschedule a post

schedule_post
DestructiveIdempotent

Set the date and time of an existing post. A scheduled post moves to the new time; a DRAFT (or a failed post) becomes scheduled for that time. Without an offset the time is the organization's local time.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "postId": "<postId>",
      "scheduledFor": "<scheduledFor>"
    },
    "name": "schedule_post"
  }
}

Input Schema

NameRequiredDescriptionDefault
postIdYes
scheduledForYesNew date/time, ISO 8601.
idempotencyKeyNoOptional. A unique id for this action (16-128 chars: letters, digits, _ : . -). If you are unsure whether a call went through (timeout, network error), repeat it with the SAME idempotencyKey and the same arguments: you get the original result and nothing is done twice.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.9/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare destructiveHint=true, idempotentHint=true and openWorldHint=true, yet the description adds real behavior beyond them: the post-state transitions that will occur and the timezone rule (organization's local time when no offset is supplied). It does not warn that an existing scheduled time is overwritten or note any permission/publishing prerequisites, which would fully close the gap for a destructive mutation.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three short sentences, front-loaded with the core action, then the state outcomes, then the timezone caveat. No filler, no restatement of the title, and each sentence carries distinct information.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a three-parameter mutation with no output schema, the description covers the affected states and the timezone interpretation, which are the main sources of agent error. What remains missing is what the tool returns and whether pre-existing scheduling side effects are cancelled, though the annotations carry the safety profile.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is only 67% and leaves postId undocumented, but the description compensates on the most consequential parameter by explaining that a time without an offset is interpreted in the organization's local timezone — meaning the schema's bare 'ISO 8601' does not capture. That is meaningful added semantics beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb+resource ('Set the date and time of an existing post') and goes further by describing the state machine: a scheduled post moves, a DRAFT or failed post becomes scheduled. It is clearly distinguishable from create_post or unschedule_post by the 'existing post' scoping, though it does not name the closest sibling explicitly.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied by the state descriptions (only existing posts, including drafts and failed posts), which gives an agent a decent picture of applicability. However, there is no explicit when-not guidance and no mention of unschedule_post as the alternative for removing a schedule, so routing must be inferred from names.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources