GB Electricity Grid: Interconnectors
gb-electricity__interconnector-listEvery GB interconnector and the bidding zone it connects to. Free within the daily allowance, then $0.0005 USDC per call via x402.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "gb-electricity__interconnector-list"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||