Estimate a change order
estimate_change_orderPrices a scope change on an existing Phulax project (materials + labor + 10% contingency) and returns a title, description, amount and cost breakdown. It is an estimate only: nothing is saved or sent. Counts toward the daily AI limit.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"project_id": "<project_id>",
"change_description": "<change_description>"
},
"name": "estimate_change_order"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| project_id | Yes | Phulax project id (from list_projects or create_estimate). | |
| change_description | Yes | The change in scope, e.g. "Upgrade the shower to a curbless walk-in with a linear drain". |