Skip to main content
Glama

finwire.pl - Polish financial data

House building cost in Poland: replacement cost per m2 and construction prices (voivodes, BGK, GUS)

get_build_cost
Read-onlyIdempotent

Use for how much it costs to build a house in Poland, the cost of building 1 m2 in a voivodeship, the official replacement cost indicator (koszt odtworzenia 1 m2) announced by voivodes, and how construction prices change (GUS). For flat prices, use get_housing_prices; for BGK price limits of the family housing loan, use get_rkm_price_limits. What building a house costs in Poland according to official indicators. Replacement cost of 1 m2 of a residential building announced by each voivode every half year (average of the two latest announcements, derived from BGK family housing loan limits): voivodeship city, the municipalities bordering it and the other municipalities of the voivodeship. Gives a 120 m2 house per voivodeship and its change in a year, Koszt budowy domu finwire (finwire_house_build_cost: a 120 m2 house at the middle value of the 16 voivodeships), an optional estimate for your floor area, and GUS construction and assembly price indices (m/m and y/y, construction of buildings and other divisions). The replacement cost is an official indicator, not a contractor quote: a real house can cost more or less depending on the project, standard and materials, and the plot is not included.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "get_build_cost"
  }
}

Input Schema

NameRequiredDescriptionDefault
area_m2NoUsable floor area of the house in m2 for an estimate (needs voivodeship).
historyNoNumber of past months of GUS construction prices in the summary, default 6.
locationNoPart of the voivodeship for the estimate: rest = other municipalities (default), neighbors = municipalities bordering the voivodeship city, city = the voivodeship city.
voivodeshipNoVoivodeship slug, name or voivodeship city, e.g. malopolskie or Kraków; default all 16.

Output Schema

NameRequiredDescriptionDefault
urlYes
asOfNo
dataNo
titleYes
sourceYes
docsUrlYes
licenseYes
summaryYes
citationYes
datasetIdYes
sourceUrlNo
truncatedNo
serverDateYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint, idempotentHint, and openWorldHint=false, but the description adds real domain context: values are averaged over the two latest half-yearly voivode announcements and derived from BGK loan limits, plus the 120 m2 reference house and the plot-exclusion caveat. It does not cover update timing beyond 'every half year' or anything about data recency limits, which keeps it just short of a 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness2/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The routing guidance is front-loaded, which is good, but the text is a dense, repetitive block. 'What building a house costs in Poland according to official indicators' merely restates the first sentence, and the output description (120 m2 house per voivodeship, m/m and y/y indices) duplicates what the output schema should carry.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present and 100% parameter coverage, the remaining burden is semantic, and the description supplies it: data provenance, semi-annual refresh, averaging rule, geography breakdown (city, neighbors, rest), and the official-indicator caveat. Nothing an agent needs in order to call this correctly is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema does the heavy lifting; the baseline is 3. The description adds some meaning: it clarifies that area_m2 drives an optional estimate (implying it needs a voivodeship) and gives the default 120 m2 house framing, but it says nothing about the history parameter's effect on GUS price output.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The opening sentence states a specific subject: how much it costs to build a house in Poland, the replacement cost of 1 m2 per voivodeship, and GUS construction price indices. It explicitly separates itself from get_housing_prices (flat prices) and get_rkm_price_limits (BGK loan limits), so an agent can route without opening a schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Guidance is explicit: 'Use for how much it costs to build a house...' names the sibling tools to use for flat prices and BGK limits. It also states a when-not-to-trust caveat, namely that the replacement cost is an official indicator rather than a contractor quote and excludes the plot, so the estimate should not be read as a market quote.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.