Fare construction savings strategy
fare_construction_savings_strategySubmits a fare-construction record (trip definition, fare drivers, search strategy, total-cost surface, fare construction, price integrity) and returns a deterministic FARE_CONSTRUCTION_SAVINGS_STRATEGY_READY / FARE_CONSTRUCTION_SAVINGS_STRATEGY_NOT_READY / INSUFFICIENT_EVIDENCE verdict across six sections, including computed total-cost, constructed-total and savings arithmetic, with per-check evidence. Audits the declared record; it searches no fares and books nothing.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "fare_construction_savings_strategy"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| trip | No | Trip evidence. | |
| drivers | No | Drivers evidence. | |
| strategy | No | Strategy evidence. | |
| integrity | No | Integrity evidence. | |
| total_cost | No | Total cost evidence. | |
| trip_label | No | Trip the fare construction covers. | |
| construction | No | Construction evidence. |