Engineering project budget pack
engineering_project_budget_packSubmits an engineering project budget pack (basis document, budget build and line items, contingency, reserve and totals, approval and baseline, change control and tracking, closeout) and returns a deterministic BUDGET_PACK_READY / BUDGET_PACK_NOT_READY / INSUFFICIENT_EVIDENCE verdict across six sections, including computed line-amount, subtotal, contingency, totals-chain, change and forecast-variance arithmetic, with per-check evidence. Audits the declared pack; it prepares no budget.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "engineering_project_budget_pack"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| basis | No | Basis evidence. | |
| build | No | Build evidence. | |
| entity | No | Project / budget pack being audited. | |
| totals | No | Totals evidence. | |
| changes | No | Changes evidence. | |
| approval | No | Approval evidence. | |
| closeout | No | Closeout evidence. | |
| tracking | No | Tracking evidence. | |
| line_items | No | Declared line items: {label, category, pricing_basis, quantity, unit_rate, declared_amount}. | |
| contingency | No | Contingency evidence. | |
| change_entries | No | Declared change entries: {label, cost_impact, impact_statement_present, approved_before_work}. |