Cost estimate preparation
cost_estimate_preparationSubmits a cost-estimate manifest (basis and class, element line items, three-point uncertainty items, declared totals chain, should-cost and vendor-quote record, estimate-vs-actual feedback record) and returns a deterministic COST_ESTIMATE_READY / COST_ESTIMATE_NOT_READY / INSUFFICIENT_EVIDENCE verdict across six sections, including computed line-amount, subtotal, contingency, escalation, grand-total and should-cost-variance re-derivations, with per-check evidence. Validates the declared estimate; it produces no estimate.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "cost_estimate_preparation"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| basis | No | Basis and estimate-class evidence. | |
| entity | No | Project / scope the estimate covers. | |
| totals | No | Declared totals-chain evidence (subtotal, contingency, escalation, grand total). | |
| elements | No | Estimate-elements evidence. | |
| feedback | No | Estimate-vs-actual feedback evidence. | |
| line_items | No | Declared line items: {quantity, unit_rate, amount}. | |
| should_cost | No | Should-cost / vendor-quote evidence. | |
| uncertainty | No | Three-point uncertainty evidence (items with optimistic / likely / pessimistic). |