Budget design review
budget_design_reviewSubmits a budget-design manifest (scope, lines with owners and drivers, totals, revenue link, contingency, approval baseline, monitoring, close) and returns a deterministic BUDGET_DESIGN_SOUND / BUDGET_DESIGN_NOT_SOUND / INSUFFICIENT_EVIDENCE verdict across six sections, including computed line-amount, declared-total, balance-against-income and horizon checks, with per-check evidence. Reviews the declared design; it does not author a budget.
Tool call template
This tool declares no required parameters. Add optional parameters from the input schema as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "budget_design_review"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| close | No | Close-out evidence. | |
| lines | No | Declared budget lines: {owner, approach, driver_quantity, driver_unit_cost, amount}. | |
| scope | No | Scope and budget-type evidence. | |
| budget | No | Budget under review. | |
| totals | No | Declared-totals evidence. | |
| revenue | No | Revenue-link evidence. | |
| approval | No | Approval and baseline evidence. | |
| monitoring | No | Monitoring evidence. | |
| contingency | No | Contingency evidence. |