CMBS special servicing timeline
special_servicing_timelineThe contractual sequence after a missed monthly payment or a missed balloon on a CMBS loan, day by day: transfer to the special servicer, SEC delinquency status codes, the appraisal reduction trigger and deadline, the 120-day maturity window, each with its PSA section. Give days_elapsed to get which events have already been triggered and the next one with days remaining.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"trigger": "<trigger>"
},
"name": "special_servicing_timeline"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| trigger | Yes | missed_payment = a monthly payment went unpaid; missed_balloon = the loan was not repaid at maturity. | |
| days_elapsed | No | Days since the missed payment due date or the maturity date. Omit to get the full sequence. |