Skip to main content
Glama

ServiceMonster MCP by usefulapi

Read detailed schedule items

servicemonster_list_scheduleitems
Read-only

GET /v1/scheduleitems. Defaults to today through7days ahead at the vendor. Use startDate/endDate for a bounded period; dates follow the company's scheduling context. Returns each event and its associated job/activity/reminder/event details.

Input Schema

NameRequiredDescriptionDefault
endDateNo
startDateNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true, so the safety profile is covered. The description adds genuine behavioral context beyond that: the implicit default date range, the fact that dates are interpreted against the company's scheduling context, and the shape of the returned payload. It omits pagination or result-size limits, keeping it from a 5.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Three short sentences, front-loaded with the endpoint and the default behavior, with no filler. There is a minor typo ('through7days') that slightly hurts readability but no wasted content.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a two-optional-parameter read tool with no output schema, the description covers the default range, the override mechanism, the date interpretation context, and what is returned. Only pagination/limits and precise date format are left unaddressed, which is a small gap.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 0%, so the two parameters rely on the description. It explains that startDate/endDate bound the period and that omitting them yields a default window, which is real added meaning. It does not clarify format (date-only vs full timestamp) or inclusive/exclusive boundary behavior, so the compensation is only partial.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a specific resource (schedule items) and states what is returned: each event plus its associated job/activity/reminder/event details. That is more than a restatement of the title. It does not distinguish itself from the close sibling `servicemonster_list_scheduling`, so it falls short of a 5.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It states the default window (today through 7 days ahead) and that startDate/endDate should be used for a bounded period, which implies when to supply parameters. However, it gives no guidance on when to pick this tool over `list_scheduling` or `list_jobs`, and no exclusions or prerequisites are mentioned.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.