Update flow scheme
update_flow_schemeEdit a flow scheme (partial). A sent flows tree replaces the stored one entirely. Campaigns that already applied the scheme keep their own copy.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"id": "<id>"
},
"name": "update_flow_scheme"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| id | Yes | Flow scheme id | |
| name | No | ||
| tags | No | ||
| flows | No | Routing tree, evaluated in order. Exactly one flow should be is_default (catch-all, no rules). On update the list is complete: rows match by id, omitted rows are deleted. | |
| status | No | ||
| group_id | No | ||
| auto_metric | No | ||
| description | No | ||
| flow_rotation | No | ||
| auto_min_clicks | No | ||
| auto_explore_percent | No |