Skip to main content
Glama

Update scheduled pin

update_schedule
DestructiveIdempotent

Edit a pending schedule in place: time, board, text or media.

    Use to fix a wrong run_at, board, title or link on a schedule that has
    not started publishing, instead of cancel_schedule plus
    create_schedule; the id and history are kept. Once the schedule has
    run its pin is published and can no longer be edited; for a failed one
    use retry_schedule. Pass at least one field.

    Returns the updated schedule, still in status "scheduled". A new board
    is preflighted like create_schedule. Fails with not_found for an
    unknown id, schedule_not_editable (409) once publishing started, with a
    remediation naming the right tool, validation_error for a past or
    timezone-less run_at, and sandbox_board_fixed when changing the board
    of a sandbox schedule.
    

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
titleNoPin title, at most 100 characters.
run_atNoNew publish time, ISO 8601 with timezone, in the future.
asset_idNoReplace the media with this uploaded asset (drops any image_url).
board_idNoPinterest board ID (numeric string), from list_boards.
link_urlNoDestination URL opened when the pin is clicked.
image_urlNoReplace the media with this public URL (drops any asset_id).
descriptionNoPin description, at most 800 characters.
schedule_idYesUUID of the schedule, from list_schedules or create_schedule.
cover_image_urlNoPublic cover image URL; video pins only.
cover_image_asset_idNoUploaded image asset UUID used as the video cover.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

Score is being calculated.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources