Skip to main content
Glama

Kaleidoscope MCP (SEC & financial data)

Power Forward Supply Curve (net MW adds/retires by fuel × year, PIT) [beta]

sec_power_supply_curve
Read-onlyIdempotent

Forward supply curve from SEC disclosures: net generation MW added vs retired by fuel × target year, as-of a date. The cross-sectional aggregate a frontier LLM can't reconstruct from reading filings — survivorship-complete, point-in-time, across the whole 722-filer power universe.

Validated headline (2026-06-03 data): coal retire 8,908 MW (8.9 GW) for target year 2027 across 12 events. Pass iso='PJM'/'ERCOT'/etc. to scope to one market, or fuel='coal'/'gas'/etc. to scope to one fuel.

PIT semantics: when as_of is provided, the underlying DISTINCT ON dedup is recomputed using only events filed on or before that date — so a 2024 supply curve doesn't include 2025 plan revisions. Always returns the as_of used.

Source: per-filer disclosures in power_capacity_events, deduped by (filer_cik, unit_name_raw, event_type) latest filing. Every aggregate row carries representative source_accession + filed_at + snippet so the LLM can cite. CAVEAT: filer-disclosed only — utility plans that didn't make it into a 10-K/8-K won't be here.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "sec_power_supply_curve"
  }
}

Input Schema

NameRequiredDescriptionDefault
isoNoScope to one ISO/RTO market (PJM / ERCOT / CAISO / MISO / NYISO / ISO-NE / SPP / non-RTO).
fuelNoScope to one fuel type (coal / gas / gas_peaker / gas_ccgt / nuclear / wind / solar / battery / hydro / oil / biomass / …).
as_ofNoISO date for point-in-time supply curve (default: today, i.e. latest disclosures). E.g. '2024-12-31' to see what the curve looked like at end of 2024.
year_toNoUpper bound on target_year (default 2035).
year_fromNoLower bound on target_year (default 2024).

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly/idempotent/non-destructive, and the description still adds substantive behavior: the DISTINCT ON dedup key, how as_of rewrites the aggregate from only events filed on or before that date, and that the response always echoes the as_of used. It also discloses the key limitation (filer-disclosed only, non-filed utility plans absent) and that every row carries source_accession, filed_at and snippet for citation.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the core definition, then scoping, then PIT semantics, then the source/caveat — a logical order. The 'Validated headline' block is useful calibration but is the most expendable passage; the '[beta]' framing and some promotional phrasing ('the cross-sectional aggregate a frontier LLM can't reconstruct') cost a bit of density.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a five-param, no-output-schema aggregation tool this covers a lot: what is aggregated, how dedup and point-in-time work, what fields come back for citations, and the coverage caveat. Remaining gaps are minor, e.g. no indication of response size or behavior for very wide year_from/year_to ranges.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, but the description goes beyond the schema by explaining that as_of recomputes the underlying dedup to a point-in-time view and that a 2024 curve excludes 2025 revisions — semantics the schema field text does not convey. The iso and fuel examples with concrete values add a little extra usable signal.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource: 'net generation MW added vs retired by fuel × target year, as-of a date', sourced from SEC disclosures. It also signals its distinct role as the 'cross-sectional aggregate a frontier LLM can't reconstruct from reading filings', which implicitly separates it from the raw-event sibling sec_power_capacity_events, but it never names an alternative or explicitly excludes one.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Guidance is limited to parameter usage ('Pass iso=PJM to scope to one market, or fuel=coal to scope to one fuel') and a worked headline example, which implies when the tool is useful. There is no explicit statement of when to prefer this over sec_power_capacity_events or sec_power_demand_forward, and no exclusions.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources