Skip to main content
Glama

Kaleidoscope MCP (SEC & financial data)

mining_company_reserves

Read-onlyIdempotent

For NI 43-101 projects (any commodity, ~1,500 projects, stage / NPV / IRR / P&P / M&I) use mining_projects — this tool is kept for one release (#2487) for the 7 gold majors' company totals below.

Company-level gold reserves (proven+probable Moz) + annual production + AISC ($/oz) for the major gold producers — structured, reconciled, and provenance-backed. Replaces scraping a 10-K's reserve tables (which mangles them — the '271 Moz' / '46.5 Moz production' misreads). Every figure is reconciled (contained ≈ tonnes × grade) and carries its SEC accession + source doc; implausible values are WITHHELD (NULL), never guessed.

Coverage (7 gold majors, FY2025): reserves for NEM (134.4 Moz) / GOLD-Barrick (146.4) / AEM (55.4) / GFI (54.9) / KGC (19.7); production + AISC for all 7 (incl. AU / HMY / AEM). Source: SEC SK-1300 Technical Report Summaries + Canadian AIFs (SK-1300 is modeled on NI 43-101, so the same extraction applies).

Inputs: ticker (one of NEM / GOLD / GFI / KGC / AU / HMY / AEM — omit for all), commodity (default 'gold'), include_deposits (default false — add the per-deposit reconciled detail rows with grade/tonnage/contained + citation).

Contracts / caveats (surface these): (1) Withheld headline — when reserves_completeness != 'ok', reserves_pp_moz is NULL by design (value withheld, not the row): AU/HMY report Mt-Moz where the schema expects kt-koz (a uniform ~1000× scale error the ratio reconciliation can't catch → gated out; HMY's South-African reef units don't reconcile in the schema either); AEM now serves via a stated_total tier. Their production + AISC ARE trustworthy and still serve. reserves_completeness ∈ {ok, stated_total, incomplete, implausible} tells you WHY a reserve is NULL vs merely absent. (2) Basis not normalized — reserves_pp_moz is as-reported; some filers state 100%-project basis, others attributable (Barrick 146 is 100%-basis; attributable ≈ 89). A basis flag is a sedar v2 item. (3) Do NOT sum the deposit detail — it includes the filing's own subtotal rows (e.g. 'Total Peñasquito'); use the summary reserves_pp_moz for company totals. (4) effective_date is sparse (NEM/GOLD have it). Refreshes on annual filing cadence.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "mining_company_reserves"
  }
}

Input Schema

NameRequiredDescriptionDefault
limitNoMax deposit-detail rows when include_deposits (default 100, max 500).
tickerNoOne gold major (NEM / GOLD / GFI / KGC / AU / HMY / AEM), case-insensitive. Omit to return all.
commodityNoCommodity, default 'gold' (the live set; silver/copper appear in the deposit detail for multi-commodity mines).
include_depositsNoAlso return the per-deposit reconciled detail rows (deposit / category / tonnes / grade / contained + citation). Do NOT sum them — see caveats.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.8/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnly/idempotent/non-destructive, but the description adds substantial context they cannot: reconciliation discipline (contained ≈ tonnes × grade), SEC accession provenance, deliberate NULL withholding gated by `reserves_completeness` ∈ {ok, stated_total, incomplete, implausible}, the un-normalized 100%-vs-attributable basis problem (Barrick 146 vs ~89), unit-scale failure modes for AU/HMY, sparse `effective_date`, and annual filing refresh cadence.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The deprecation/routing notice is correctly front-loaded and the caveats are numbered and scannable. It is long and dense, with some redundancy (the 'do not sum deposits' warning appears both in the caveats and the schema descriptions) and per-company Moz figures that are useful for sanity-checking but pad the text.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, and the description compensates fully by describing the returned fields (reserves_pp_moz, production, AISC, reserves_completeness, basis, effective_date, per-deposit detail with citations) plus the conditions under which a field is legitimately NULL. Nothing an agent needs to call or interpret this tool is missing.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3, but the description adds real meaning: the ticker enumeration context (omit for all seven), the commodity default being the live set, and the warning that `include_deposits` rows contain the filing's own subtotal rows and must not be summed — guidance the schema does not carry.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names the exact resource (company-level gold reserves in Moz, annual production, AISC in $/oz) and the exact population (the 7 gold majors, FY2025), and explicitly contrasts itself with `mining_projects` for NI 43-101 project data. An agent can distinguish it from the sibling without opening either schema.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It states the routing rule up front: use `mining_projects` for NI 43-101 projects of any commodity, and use this tool only for the 7 majors' company totals, noting it is retained for one release (#2487). That is an explicit when-to-use and when-not-to-use statement naming the alternative.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources