Generate sprints
generate_sprintsAdd back-to-back sprints: count sprints of weeks weeks each from start, named " " (prefix defaults to Sprint; numbering continues from the roadmap's highest sprint number unless firstNumber is given). Up to 52 at a time. Switches sprints on if needed. Needs read-and-change access.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"roadmapId": "<roadmapId>",
"start": "<start>",
"weeks": "<weeks>",
"count": "<count>"
},
"name": "generate_sprints"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| color | No | Color as #rrggbb (optional) | |
| count | Yes | How many sprints | |
| start | Yes | First sprint's start date (YYYY-MM-DD) | |
| weeks | Yes | Sprint length in weeks (1 to 8) | |
| prefix | No | Name prefix (default Sprint) | |
| roadmapId | Yes | Roadmap id | |
| firstNumber | No | Number of the first sprint (default: next free number) |