check tw rental deposit termination
check_tw_rental_deposit_terminationTaiwan residential lease check (租賃住宅市場發展及管理條例): deposit cap of 2 months' rent (第7條) returned when the home is handed back, 30 days' written notice for early termination on statutory grounds (第10條・第11條) and 3 months for landlord rebuilding. Current standard contract terms are not computed. Taiwan (law.moj.gov.tw), as of 2026-11-21. General information and estimates only: no legal advice, no representation, no filing; values that could not be verified are flagged in the result, not computed.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"rent": "<rent>",
"deposit": "<deposit>"
},
"name": "check_tw_rental_deposit_termination"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| rent | Yes | Monthly rent (TWD) | |
| deposit | Yes | Deposit (TWD) | |
| rebuild | No | Landlord ends the lease to rebuild (3 months' notice) | |
| noticeDate | No | Date written notice was given |