Korean subcontract direct payment (하도급대금 직접 지급, 하도급법 제14조): the client (발주자) must pay the subcontractor directly when the prime contractor stops payment, goes bankrupt or loses its license (on request), the three parties agree, the prime missed 2+ installments (on request), or the prime gave no payment guarantee (on request); blocked when the prime documents the subcontractor's own wage or material arrears (③); limited to what the client has not yet paid the prime (④). Also late interest at 15.5% a year after 60 days from delivery (제13조⑧, FTC notice).

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "cause": "<cause>",
      "requested": "<requested>",
      "workValue": "<workValue>",
      "receivedFromPrime": "<receivedFromPrime>",
      "ownerUnpaidToPrime": "<ownerUnpaidToPrime>",
      "daysSinceDelivery": "<daysSinceDelivery>"
    },
    "name": "check_kr_subcontract_direct_payment"
  }
}

Input Schema

NameRequiredDescriptionDefault
causeYesDirect payment ground
requestedYesThe subcontractor asked the client for direct payment
workValueYesSubcontract price of the work done (KRW)
primeStopRequestNoThe prime documented the subcontractor's wage/material arrears and asked the client to stop
daysSinceDeliveryYesDays since delivery or completion was accepted
receivedFromPrimeYesAmount already received from the prime (KRW)
missedInstallmentsNoInstallments the prime has not paid
ownerUnpaidToPrimeYesAmount the client still owes the prime for that work (KRW)

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A3.5/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover the safety profile (readOnlyHint, idempotentHint, destructiveHint=false, closed-world), so the bar is lower. The description does add real substance beyond that: the blocking condition (③ documented wage/material arrears), the cap at what the client still owes the prime (④), and the 15.5%/60-day late-interest rule — but it never says what the tool returns or how the outcome is presented.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is a single dense but front-loaded sentence that opens with the Korean term and article citation, then moves to triggers, then exceptions. Nothing is redundant with the title, though the packed legal parentheticals make it harder to scan than a short structured list would be.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness3/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For an 8-parameter tool with 6 required inputs and no output schema, the description covers the decision logic well but leaves the return value and its shape unexplained. An agent knows the rule but not whether it will receive a boolean, a payment amount, or a reasoning string.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so baseline 3 applies, and the description genuinely earns above that by mapping legal provisions onto specific inputs: the five 'cause' grounds correspond to insolvency/agreement/twoMissed/noGuarantee/none, ③ explains primeStopRequest, and ④ explains the ownerUnpaidToPrime cap. It stops short of clarifying how missedInstallments (2+ threshold) or daysSinceDelivery interact with the result.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names the specific legal doctrine (하도급법 제14조 direct payment) and enumerates the triggering conditions, so an agent can tell this is a determination tool for whether the client must pay the subcontractor directly. The verb itself ('check' → what result is produced) is never stated explicitly, leaving the agent to infer that it returns a decision rather than an explanation.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is implied by the narrow legal domain — you call this when a Korean subcontract direct-payment question arises — but there is no explicit when/when-not guidance and no reference to any alternative tool. Since sibling names here are all unrelated calculators and checks, the absence of routing is tolerable but still a gap.