check big order capacity
check_big_order_capacityBig new order vs existing commitments under limited capacity: profit of declining, accepting in full, accepting only spare capacity, accepting with overtime/outsourcing, and the profit-maximising quantity; existing orders are cut in order of lowest margin plus penalty and locked commitments are never cut in the recommendation. Same engine as tools.oiyo.net.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"capacity": "<capacity>",
"existing": "<existing>",
"newOrder": "<newOrder>"
},
"name": "check_big_order_capacity"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| capacity | Yes | Units that can be made in the period | |
| existing | Yes | Existing commitments | |
| newOrder | Yes | ||
| extraCapacity | No | Extra units from overtime/outsourcing | |
| extraCostPerUnit | No | Extra cost per overtime/outsourced unit |