compute_wind_lcoe_and_eya
[0.005000 USDC via x402] Computes IEC-grounded Weibull P50/P75/P90 net annual energy production (MWh) with RSS uncertainty and exact Decimal project finance metrics (Total CAPEX, LCOE $/MWh, NPV, Project IRR %, Min P90 DSCR).
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"capacity_mw": "<capacity_mw>"
},
"name": "compute_wind_lcoe_and_eya"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| weibull_k | No | Weibull shape parameter k between 1.2 and 4.0 (default '2.1'). | |
| capacity_mw | Yes | Installed wind farm nameplate capacity in MW (0.5 to 5000). | |
| project_years | No | Operating project lifetime in years between 5 and 35 (default 20). | |
| wake_loss_pct | No | Array wake loss percentage between 0 and 30 (default '7.5'). | |
| capex_usd_per_kw | No | Total installed CAPEX in USD per kW (default '1350'). | |
| discount_rate_pct | No | Nominal WACC / discount rate percentage (default '8.0'). | |
| mean_wind_speed_ms | No | Hub-height annual mean wind speed in m/s (default '7.8'). | |
| opex_usd_per_kw_yr | No | Annual O&M OPEX in USD per kW-year (default '36'). | |
| ppa_price_usd_per_mwh | No | Power Purchase Agreement tariff in USD per MWh (default '78.0'). | |
| x402_payment_signature | No | Optional base64 x402 PAYMENT-SIGNATURE header token (0.005000 USDC on Base eip155:8453 or Polygon eip155:137). Omit to receive the live x402 quote. |