Skip to main content
Glama

create_personio_attendance

Destructive

Create an attendance period (POST /v2/attendance-periods) — e.g. transfer an approved clockin workday. Required: person_id, type (WORK|BREAK), start (LOCAL time YYYY-MM-DDTHH:mm:ss, no time zone). Optional: end (local; max 24 h, no overlap, no crossing midnight — split at 00:00), comment, project_id (WORK only, project must be ACTIVE), skip_approval. Changes payroll-relevant time — needs approval.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "person_id": "<person_id>",
      "type": "<type>",
      "start": "<start>"
    },
    "name": "create_personio_attendance"
  }
}

Input Schema

NameRequiredDescriptionDefault
endNoEnde, lokale Zeit (leer = offen)
typeYesWORK oder BREAK
startYesBeginn, lokale Zeit
commentNoKommentar, z. B. Herkunft clockin
person_idYesPersonio-ID der Person
project_idNoPersonio-Projekt-ID (nur WORK)
skip_approvalNoGenehmigung in Personio überspringen (nur wenn die Zeit im Quellsystem, z. B. clockin, schon freigegeben ist)

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

A3.8/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare destructive=true, non-idempotent, open-world, so the bar is lower, yet the description still adds real context: it changes payroll-relevant time, requires approval, rejects overlaps, disallows crossing midnight (split at 00:00), caps duration at 24 h, and requires the project to be ACTIVE. It does not state what happens to an existing period on the same day or how approval/skip_approval interacts downstream, keeping it at 4.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

A single dense paragraph that front-loads verb, endpoint, then required fields, then optional fields and constraints — no wasted sentences. It is telegraphic to the point of abbreviation ('e.g.', 'max 24 h'), which slightly hurts readability but not information density.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 7-parameter mutation tool with no output schema, the definition covers the time semantics, key business validations, and the approval nuance that an agent needs before calling. What is missing is the response shape and any permission/auth requirements, which matters for a payroll-affecting write but is a modest gap.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so baseline is 3, but the description genuinely extends the schema: it specifies the exact start/end format (YYYY-MM-DDTHH:mm:ss, no time zone), the WORK|BREAK values, that project_id applies to WORK only and must be ACTIVE, and the max-24h/no-overlap/no-midnight-crossing rules that the schema's German one-liners omit.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Create an attendance period') and even names the underlying endpoint (POST /v2/attendance-periods), plus a concrete example use case ('transfer an approved clockin workday'). The verb alone separates it from get/update/delete_personio_attendance siblings; no sibling is named explicitly, so it falls just short of 5.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is conveyed only through a single example ('e.g. transfer an approved clockin workday') and the note that it 'needs approval'. There is no explicit when-not guidance and no pointer to update_personio_attendance for correcting an existing period, so the agent must infer routing from the verb.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.