project_intake
Normalize a project brief into a stateless machine-readable engineering intake. Excavation/foundation groundwater projects run CAL-065 network/perimeter, CAL-066 gravity HGL and CAL-067 pump TDH/wet-well screens. Missing values remain null and return HOLD; nothing is persisted.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| goal | No | ||
| pump | No | ||
| drainage | No | ||
| evidence | No | ||
| geometry | No | ||
| structure | No | ||
| project_id | No | ||
| constraints | No | ||
| groundwater | No | ||
| project_type | Yes | ||
| investigation | No | ||
| required_output | No |