Skip to main content
Glama

rfbench RF Math & FCC Compliance Oracle (MCP)

rf_touchstone_analyze

Metered ($0.015): IEEE Touchstone v1.0 .s1p/.s2p analysis, uniform single-pass phase rotation S_ijexp(+j2pifdelay_ps1e-12) across s11/s21/s12/s22 (use delay_ps=2*tau for 1-port round-trip VNA extension), passbands, and Rollett K/stability.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "touchstone_text": "<touchstone_text>"
    },
    "name": "rf_touchstone_analyze"
  }
}

Input Schema

NameRequiredDescriptionDefault
delay_psNoUniform single-pass electrical phase rotation S_ij * exp(+j * 2 * pi * f * delay_ps * 1e-12) across all S-parameters (s11, s21, s12, s22). For 1-port round-trip VNA fixture extension of one-way delay tau, pass delay_ps = 2 * tau.
port_overrideNo
include_pointsNo
vswr_thresholdNo
touchstone_textYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

C2.8/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations are provided, so the description carries the full behavioral burden. It usefully discloses the metered cost ($0.015) and the exact phase-rotation math, which are real behavioral traits, but it says nothing about error handling on malformed Touchstone text, return structure, or whether anything persists — notable gaps for a no-annotation tool.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is a single dense sentence with the cost front-loaded, so nothing is wasted. However, the heavy parenthetical nesting and inline formula make it harder to scan than a two-sentence split between purpose and the delay convention would be.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With five parameters, 20% schema coverage, no annotations, and no output schema, the description should explain the undocumented parameters and at least sketch the return shape. It covers only delay_ps and the computational features, leaving three parameters and the output entirely unspecified.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters2/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is only 20%, so the description needs to compensate and largely does not. It thoroughly restates delay_ps (which the schema already documents) and hints at port count via .s1p/.s2p, but port_override, include_points, and vswr_threshold are left unexplained in both places.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a specific resource and format (IEEE Touchstone v1.0 .s1p/.s2p) and enumerates concrete outputs: uniform phase rotation, passbands, and Rollett K/stability. That is enough for an agent to tell it apart from siblings like rf_smith_transform or rf_match_network, but no sibling is named explicitly, so it stops short of a 5.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no statement of when to choose this tool over rf_smith_transform or rf_match_network, and no when-not conditions. The only actionable usage hint is the delay_ps=2*tau convention for 1-port round-trip VNA extension, which is a parameter convention rather than tool-selection guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.