Skip to main content
Glama

rfbench RF Math & FCC Compliance Oracle (MCP)

rf_link_budget

Free tier: Friis FSPL, EIRP/ERP, 290K thermal noise floor, SNR, Fresnel radius, and max range. Supply tx_gain_dbi or tx_gain_dbd.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "freq_hz": "<freq_hz>",
      "distance_m": "<distance_m>",
      "tx_power_dbm": "<tx_power_dbm>",
      "rx_gain_dbi": "<rx_gain_dbi>",
      "bandwidth_hz": "<bandwidth_hz>"
    },
    "name": "rf_link_budget"
  }
}

Input Schema

NameRequiredDescriptionDefault
z0No
freq_hzYes
distance_mYes
rx_gain_dbiYes
tx_gain_dbdNo
tx_gain_dbiNo
bandwidth_hzYes
tx_power_dbmYes
noise_figure_dbNo
required_snr_dbNo
rx_cable_loss_dbNo
tx_cable_loss_dbNo
rx_sensitivity_dbmNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

C2.7/5.0
Behavior2/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

No annotations exist, so the description carries the full behavioral burden, and it discloses only the computed outputs and the free-tier framing — the latter hinting at tier limits without explaining them. It says nothing about which optional inputs unlock which outputs (e.g., that max range presumably needs required_snr_db and losses), unit conventions or defaults, error behavior on invalid geometry, or whether the 290K noise floor is fixed. For a 13-parameter physics tool this is thin.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two short sentences, front-loaded with the capabilities list, with no filler. The 'Free tier:' prefix is arguably marketing framing rather than operational information, but it is brief and potentially relevant to expected output scope.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Against 13 undocumented parameters, zero annotations, and no output schema, the description should explain input roles and which outputs depend on which inputs. It lists output families but leaves the input contract — a blocker for correct invocation — almost entirely unexplained.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters2/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 0% across 13 parameters, so the description must compensate and largely fails to. It clarifies the dBi-vs-dBd gain choice for tx_gain_dbd/tx_gain_dbi, which is genuinely useful, but leaves z0, noise_figure_db, required_snr_db, tx_cable_loss_db, rx_cable_loss_db, and rx_sensitivity_dbm entirely undefined, and never states that the gain parameters are alternatives rather than both required.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names the concrete quantities the tool computes (Friis FSPL, EIRP/ERP, 290K thermal noise floor, SNR, Fresnel radius, max range), which clearly identifies it as an RF link-budget calculator and separates it from siblings like rf_match_network or rf_touchstone_analyze. It lacks an explicit verb and the 'Free tier:' framing adds ambiguity about whether behavior is limited, but the resource is unmistakable.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The only guidance is 'Supply tx_gain_dbi or tx_gain_dbd', which is a parameter constraint rather than a when-to-use rule. There is no statement of the scenario this tool serves (e.g., point-to-point LOS path planning vs. regulatory checks handled by rf_fcc_compliance), nor any prerequisites, exclusions, or conditions under which another sibling is preferable.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.