Skip to main content
Glama

Spp Lmp Latest

spp_lmp_latest
Read-onlyIdempotent

SPP real-time balancing market (RTBM) locational marginal prices — the most recently published 5-minute interval, per settlement location, with the LMP split into its marginal energy (MEC), congestion (MCC) and loss (MLC) components. Several hundred settlement locations per interval. Use for "SPP power price right now", "which SPP locations are congested", "SPP price spike".

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
limitNoMax locations to return (default 50, max 2000).
locationNoFilter to settlement locations whose name contains this text, case-insensitive (e.g. "AECC", "SPPNORTH_HUB").

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

The annotations already declare readOnlyHint=true, idempotentHint=true, and destructiveHint=false, so the safety profile is clear. The description adds useful behavioral context beyond annotations: it specifies recency (most recently published 5-minute interval), result volume (several hundred settlement locations per interval), and the component breakdown of each LMP. It does not discuss auth or rate limits, but for a read-only data tool that is a modest gap.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is two sentences with no filler: the first front-loads the resource, granularity, and component breakdown, while the second supplies concrete usage examples. Every clause earns its place by adding data semantics or trigger context.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Given two optional parameters, full schema coverage, and annotations covering safety, the description is nearly complete. It explains the data granularity, components, and expected volume, though without an output schema it could be slightly more explicit about the exact return fields (e.g., timestamp or location identifier).

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already fully documents both the limit and location parameters, including defaults and case-insensitive filtering. The description does not add any parameter-level syntax or filtering semantics beyond what the schema provides, making the baseline 3 appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific data resource (SPP real-time balancing market locational marginal prices), its granularity (most recently published 5-minute interval), and its structure (per settlement location, split into MEC, MCC, and MLC components). An agent can immediately tell this is a latest-interval LMP retrieval tool rather than a forecast or generation-mix sibling.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It provides explicit trigger phrases: "SPP power price right now", "which SPP locations are congested", "SPP price spike". However, it does not name an alternative tool or state when not to use this tool, so it falls short of the 5-level requirement for explicit when-not/alternatives guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.