Skip to main content
Glama

Miso Lmp

miso_lmp
Read-onlyIdempotent

MISO real-time five-minute locational marginal prices (LMP $/MWh) by pricing node, split into its energy / congestion / loss components (MEC-equivalent, MCC, MLC) together with the ancillary-service clearing prices (regulation, spinning, supplemental, short-term reserve, ramp up/down). Covers the Central, North and South regions. Use for "MISO power price right now", "which MISO nodes are congested", "MISO South vs North price spread", scarcity-pricing checks.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
nodeNoFilter to pricing nodes whose name contains this text, case-insensitive (e.g. "MINN.HUB", "LEPA").
limitNoMax nodes to return (default 50, max 2000).
regionNoFilter to one region: Central, North or South. Omit for all regions.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.2/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint=true, idempotentHint=true, and destructiveHint=false, so the safety profile is covered. The description adds useful behavioral context: real-time five-minute granularity, component breakdown, and regional coverage, which goes beyond the annotations and helps the agent understand what data to expect.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness5/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The description is compact and information-dense, with the core data content front-loaded and the use cases at the end. Every sentence earns its place, and there is no redundant or vague wording.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Given the absence of an output schema, the description does a good job of explaining what data is returned: LMP components, ancillary-service prices, and regional coverage. It could be more explicit about the return shape or time window, but the description is sufficient for an agent to select and invoke the tool correctly.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the schema already documents all three parameters. The description mentions pricing nodes and regions, but does not add meaningful parameter-level detail beyond what the schema provides, so the baseline score of 3 is appropriate.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description clearly identifies the resource: MISO real-time five-minute LMP data by pricing node, including energy/congestion/loss components and ancillary-service prices. It also distinguishes itself from sibling MISO tools by specifying unique content such as MEC/MCC/MLC components and the Central/North/South regions.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description provides explicit use cases: 'MISO power price right now', 'which MISO nodes are congested', 'MISO South vs North price spread', and scarcity-pricing checks. It does not mention when not to use it or name alternatives, but the use cases give clear context for selection.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.