Miso Binding Constraints
miso_binding_constraintsMISO real-time transmission binding constraints, the specific flowgates and facility limits currently constraining the market, with their shadow price ($/MWh of relief). A binding constraint is why LMPs diverge between nodes. Use for "why is MISO congested", "what transmission limit is binding", "which flowgate is driving the price spread".
Example tool call
This call uses example arguments supplied in the tool’s input schema.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {},
"name": "miso_binding_constraints"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| kind | No | transmission = real-time transmission flowgates (default); subregional = sub-regional power-balance constraints; reserve = reserve-product constraints. |