Skip to main content
Glama

Dod Contract Announcements

Dod Awards Search

dod_awards_search
Read-onlyIdempotent

Search US Department of War (Pentagon) contract award announcements by contractor name or by keyword in the award description — "has Lockheed Martin won a defense contract", "defense contracts for hypersonic missiles", "Pentagon awards mentioning drone swarms". At least one of query or contractor is required. Optionally restrict to awards announced on or after a given date. This is the leading, weeks-ahead-of-USAspending record of an award; combine with the usaspending pack for the fully structured historical record.

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
limitNoMax awards to return (1-100, default 25).
queryNoFree-text match (case-insensitive) against the award description paragraph, e.g. "hypersonic", "F-35 sustainment", "shipbuilding".
sinceNoOnly awards announced on or after this date (YYYY-MM-DD).
contractorNoFree-text match (case-insensitive) against the contractor name, e.g. "Lockheed Martin", "Raytheon".

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.9/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already declare readOnlyHint, idempotentHint, openWorldHint and destructiveHint=false, so the safety profile is covered. The description adds real value beyond them by disclosing source behavior: this is a weeks-ahead-of-USAspending announcement feed, implying fresher but less structured data. No return format or pagination behavior is described.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loads the verb and resource, then packs the examples and constraints tightly; the quoted example queries do useful work clarifying match semantics. Slightly dense but no sentence is wasted.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

There is no output schema, yet the description is sufficient to call the tool correctly and even notes the freshness trade-off versus USAspending. The one inconsistency worth noting is that the description claims a required query-or-contractor constraint while the schema lists no required parameters.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so all four parameters are documented with examples in the schema itself, establishing the baseline of 3. The description's example phrasings hint at query intent but add no syntax or format detail beyond what the schema provides.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

Names a specific verb (search) and resource (DoD/Pentagon contract award announcements) with two clear match modes and illustrative queries, so the agent knows exactly what the tool returns. It distinguishes itself from the external USAspending record but never differentiates from its own siblings (dod_awards_recent, dod_awards_top, dod_awards_coverage), which is the remaining gap.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives a concrete usage constraint ('At least one of query or contractor is required') and routes a different need ('fully structured historical record') to the usaspending pack. It stops short of an explicit when-not or a comparison against the sibling dod_awards_* tools.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.