Skip to main content
Glama

ITC Prevailing Wage & Apprenticeship Guide

Do PWA requirements apply to this project?

check_applicability
Read-onlyIdempotent

Says whether a project must meet the prevailing wage and apprenticeship requirements to claim the increased (5x) credit, and which ones: the credit involved, when construction began (before January 29, 2023 is exempt for 30C, 45, 45Q, 45V, 45Y, 48, 48E and 179D; 45L, 45U, 45Z and 48C have no such exception), the one-megawatt exception for 45, 45Y, 48 and 48E (maximum net output under 1 MW AC by nameplate, aggregated across the energy project or across facilities with integrated operations; for DC generation the lesser of the DC nameplate sum or the first inverter), construction versus alteration or repair after placed in service (apprenticeship applies to construction only; prevailing wages continue 5 years for the ITC, 10 for the PTC), the applicable apprentice percentage (10 / 12.5 / 15%), whether the project is under section 48 or 48E, and for solar and wind the 2025 law’s termination dates (construction after July 4, 2026 must be placed in service by December 31, 2027).

Input Schema

TableJSON Schema
NameRequiredDescriptionDefault
creditYesThe Code section claimed: 48 (energy credit), 48E (clean electricity investment credit), 45, 45Y, 45Q, 45V, 45Z, 45U, 45L, 179D, 30C or 48C.
work_typeNoconstruction (default) or alteration_or_repair after the facility is placed in service.
technologyNoWhat the facility is: solar or wind (the 2025 law’s termination dates apply), storage, or other.
dwelling_typeNoFor 45L only: the kind of home (prevailing wage reaches only multifamily units).
placed_in_serviceNoPlaced-in-service date (YYYY-MM-DD), if known or planned.
construction_beganYesWhen construction began (YYYY-MM-DD), under the IRS beginning-of-construction rules (physical work test or 5% safe harbor).
max_net_output_mw_acNoMaximum net output in megawatts AC by nameplate, AGGREGATED: for section 48 the sum of every energy property in the energy project (1.48-13(e)(1)); for 48E and 45Y the sum of every same-technology facility or storage with integrated operations (same or related owner, same taxable year placed in service, same point of interconnection or end user: 1.48E-3(c)(4), 1.45Y-3(c)(3)). Leave out if not an electricity or thermal project.

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.7/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already establish the safety profile (readOnlyHint=true, idempotentHint=true, destructiveHint=false, openWorldHint=false), so the bar is lower. The description adds genuine behavioral substance by spelling out the rules the tool applies: the pre-January 29, 2023 exemption and which credits lack it, the 1 MW aggregation logic, and the ITC/PTC wage-continuation periods. It stops short of describing the answer format or how it behaves when dates are unknown or omitted.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The content is substantive rather than padding, and the core purpose is front-loaded in the opening clause. But the entire description is a single run-on sentence of nested parentheticals (~150 words) that is hard to parse; it would benefit substantially from being split into scannable statements.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

For a 7-parameter determination tool with no output schema, the description covers the decision logic comprehensively across credits, dates, work type, technology, and size thresholds. Its main gap is that it never describes what the response looks like, which matters more given there is no output schema to fall back on.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100% with four enums, so the baseline is 3. The description goes beyond the schema by tying parameter values to outcomes: which credits carry the construction-date exception, that apprenticeship applies to construction only while prevailing wages continue 5 years for the ITC and 10 for the PTC, and the 10/12.5/15% apprentice-percentage options. That interpretive linkage adds real meaning even though much of it echoes schema text.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and outcome: it says whether a project must meet prevailing wage and apprenticeship requirements to claim the increased (5x) credit. It is clearly the applicability gate among the PWA siblings, but it never names or contrasts itself with check_prevailing_wage, check_apprentice_hours, or pwa_overview, so sibling differentiation is left implicit.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is only implied: an agent can infer this is the gating check to run before computing wage or apprentice-hour requirements. There is no explicit 'use this when' trigger, no when-not condition, and no routing to the alternative sibling tools that handle hours, ratios, or good-faith requests.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources