What a project shipped
get_project_timelineWhat did this project ship, and when? Builds, releases, code, contract deploys, upgrades and interface changes, token verification, locks and unlocks, each with how precisely HEY knows its time. Lenses: build (default), code, onchain, locks. Paged with the before cursor.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"slug": "<slug>"
},
"name": "get_project_timeline"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| lens | No | Default build. | |
| slug | Yes | A project slug, e.g. "agentos". | |
| limit | No | Default 30. | |
| before | No | The cursor the previous answer gave. |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| api | Yes | ||
| data | No | ||
| schema | Yes |