Skip to main content
Glama

getecoback-raumklima

gruppenbetrieb_doppelbelegung_stueckverdraengung

Read-only

Bei einem gemeinsamen Arbeitsbereich dokumentierte Doppelstarts von gleichzeitig tatsächlich nutzbaren Arbeitsplätzen unterscheiden — Measure output lost to overlapping equipment occupancy while respecting confirmed work positions.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "a_starts": "<a_starts>",
      "b_starts": "<b_starts>",
      "doppelte_startpaare": "<doppelte_startpaare>",
      "platzbedingt_abgebrochen": "<platzbedingt_abgebrochen>"
    },
    "name": "gruppenbetrieb_doppelbelegung_stueckverdraengung"
  }
}

Input Schema

NameRequiredDescriptionDefault
a_startsYesTatsächlich protokollierte Aufgabenstarts von A.
b_startsYesTatsächlich protokollierte Aufgabenstarts von B.
doppelte_startpaareYesNicht überlappende Paare von Starts desselben Durchgangs.
platzbedingt_abgebrochenYesBestätigte Paare, in denen genau ein Start wegen des gemeinsamen Platzes abgebrochen wurde.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Added

TDQS

C2.7/5.0
Behavior3/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

readOnlyHint=true and openWorldHint=false already tell the agent this is a safe, closed computation, so the description's remaining burden is small. It does add that the result concerns lost output attributable to overlap rather than simple start counts, but it says nothing about determinism, units of the output, or how the four counters are combined.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is a single sentence, so nothing is padded, but the German/English code-switching and the dash-joined clause make it hard to parse and bury the operative verb ("Measure") mid-sentence rather than front-loading it.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness2/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Four required numeric parameters with no output schema and no documented return value mean the description must at least indicate what the agent receives (a loss amount, a ratio, a breakdown per pair?). It does not, so an agent cannot predict the result shape of an otherwise opaque calculation.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so every parameter is already documented in German in the schema; baseline is 3. The phrase "respecting confirmed work positions" loosely points at platzbedingt_abgebrochen, but no new meaning (units, relationships, reconciliation rule) is added beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose3/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description gestures at a concrete operation ("Measure output lost to overlapping equipment occupancy while respecting confirmed work positions"), but the German clause ("dokumentierte Doppelstarts ... unterscheiden") frames it as a discrimination/classification task, leaving the agent unsure whether the tool computes a loss figure or separates start pairs. It names no sibling and gives no hint of what actually comes back.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines2/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

There is no statement of when to call this versus the nearby group-operation sibling (gruppenbetrieb_verbrauchskosten_gleiche_teilauftraege) or any other tool, and no preconditions such as requiring confirmed work positions to be established first despite the phrase "respecting confirmed work positions".

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources