Directum RX upgrade checklist
upgrade_checklistThe drxinfra.ru checklist for upgrading Directum RX with a way back: 44 items in 7 phases, from two weeks before the window through the rehearsal on a test contour, the rollback plan, the window itself, checks before users come back and the first day. Optionally marks done items and returns a link that opens the same marks on drxinfra.ru/upgrade-checklist.html, where they can be printed or saved.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| done | No | Numbers of the items already done (1-44) | |
| phase | No | Only this phase (1-7); 0 = all | |
| window | No | Planned window, for the link, e.g. 15.12 22:00-06:00 (up to 40 characters) | |
| to_version | No | Target RX version, for the link (up to 40 characters) | |
| from_version | No | Current RX version, for the link (up to 40 characters) |