EV Charger Installation Planner
ev_charger_install_costWork out the circuit a home EV charger needs, panel triage, utility install cost references and federal credit rules. Returns safety first, the exact 125% minimum breaker calculation, panel triage, unpriced extras and dated federal 30C rules. Reference cards are utility and DOE program figures, not a price for this home. A licensed electrician and permit are needed; confirm local requirements and inspection. Pure rules and Decimal, no network, model or clock. Web and MCP share the free daily allowance.
Example tool call
This call uses example arguments supplied in the tool’s input schema.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"level": "level2",
"charger_amps": 48
},
"name": "ev_charger_install_cost"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| level | No | Charging level; omit when unknown. | |
| extras | No | ||
| run_feet | No | Estimated routed panel-to-charger length, not straight-line distance. | |
| panel_amps | No | Panel/service rating, echoed only; a panel label alone cannot decide an upgrade or price the job. | |
| spare_space | No | Compatible breaker space for a new circuit. | |
| charger_amps | No | Rated or installer-set maximum charging current in amps. | |
| installed_on | No | Placed-in-service date YYYY-MM-DD; omitted follows the after-2026-06-30 rule. | |
| capacity_check | No | Electrician load calculation result; not_done means not assessed. | |
| existing_circuit | No | Suitable dedicated circuit already at the parking spot. |