Skip to main content
Glama

Staffing Math

Monthly hiring plan

hiring_plan
Read-onlyIdempotent

For hiring plans, headcount plans, and questions about when to open requisitions or how many people to hire as volume grows, shrinks or changes by season. Plans month by month how many requisitions to open so FTE on hand keeps up with FTE needed. A requisition adds capacity only after time to hire and ramp, and attrition removes people every month, so the plan opens reqs ahead of need and flags the months that run short before any new hire can count. Give weekly_volume with monthly_growth (0.05 means 5% a month, compounding), or weekly_volume_by_month. Unknown inputs fall back to stated defaults: current headcount defaults to what month 1 needs, attrition to 0, time to hire to 2 months, ramp to 0. When attrition is assumed, the result also gives the plan at 15% and 30%. Give hires_in_flight for people already hired or in the pipeline. Returns the plan table, totals, the arithmetic, and which inputs were assumed. A hire counts as zero capacity until fully ramped. Hosts that support MCP Apps also draw the plan as a chart with controls that rerun it.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "minutes_per_case": "<minutes_per_case>"
    },
    "name": "hiring_plan"
  }
}

Input Schema

NameRequiredDescriptionDefault
monthsNoPlan length in months when using monthly_growth. Default 12.
shrinkageNoShare of paid time not available for the work: PTO, sick time, training, meetings. 0.30 means 30%. Default 0.3.
ramp_monthsNoMonths from start date to full productivity. Default 0.
start_monthNoFirst month of the plan as YYYY-MM, used only to label months.
weekly_volumeNoWeekly volume in month 1. Use with monthly_growth.
monthly_growthNoMonth-over-month change in weekly volume. 0.05 means 5% a month. Default 0.
hires_in_flightNoPeople already hired or in the pipeline, and the month they start counting. These are the only way to cover months before a new requisition can land.
annual_attritionNoShare of the team that leaves in a year. 0.25 means 25%. Default 0.
minutes_per_caseYesAverage handling time per case, in minutes.
target_occupancyNoShare of available time you plan to keep people busy with the work. Default 0.85.
current_headcountNoFTE on the team today. Default: what month 1 needs, rounded up.
hours_per_fte_weekNoPaid hours per full-time person per week. Default 40.
time_to_hire_monthsNoMonths from opening a requisition to the start date. Default 2.
weekly_volume_by_monthNoAverage weekly volume in each month of the plan, instead of weekly_volume and monthly_growth.

Output Schema

NameRequiredDescriptionDefault
notesYes
stepsYes
answerYes
engineYes
inputsYes
monthsYes
most_spareYes
total_reqsYes
attrition_rangeYes
expected_leaversYes
lookahead_monthsYes
months_with_spareYes
fte_needed_last_monthYes
fte_needed_first_monthYes
first_month_hires_can_countYes
months_short_before_hires_landYes

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.2/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations already cover safety (readOnly, idempotent, non-destructive, closed-world), yet the description still adds substantial model behavior: requisitions land only after time_to_hire plus ramp, attrition compounds monthly, the plan opens reqs ahead of need and flags short months, and when attrition is assumed the result also reports plans at 15% and 30%. It also discloses the fallback defaults for unspecified inputs and notes the MCP Apps chart rendering.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

The purpose leads, input modes and defaults follow, and return shape closes – a sensible order. It is long, and the ramp point is made twice ('a requisition adds capacity only after time to hire and ramp' and 'A hire counts as zero capacity until fully ramped'), but the length is largely justified by a 14-parameter capacity model.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present, the description need not explain return values yet still names the plan table, totals, arithmetic and assumed inputs, and it covers defaulting behavior and the pipeline mechanism. The one real gap is that the volume-to-FTE conversion is never described, so the agent cannot explain how weekly volume becomes headcount without reading the schema for minutes_per_case, shrinkage and occupancy.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3. The description adds relationship-level meaning the schema cannot: monthly_growth compounds month over month, weekly_volume_by_month is mutually exclusive with weekly_volume plus monthly_growth, and default resolution for current_headcount is derived from month 1 need. It omits the capacity-conversion inputs (minutes_per_case, shrinkage, target_occupancy, hours_per_fte_week), which are documented only in the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description states a specific verb and resource: 'Plans month by month how many requisitions to open so FTE on hand keeps up with FTE needed.' It also names the question types it answers (when to open requisitions, how many to hire as volume changes). It does not differentiate itself from the sibling tools erlang_staffing or required_fte, so an agent still has to infer which of the three to call for a headcount question.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage context is explicit: hiring plans, headcount plans, and questions about requisition timing or hiring volume. It also tells the agent which input shapes are valid ('Give weekly_volume with monthly_growth ... or weekly_volume_by_month') and to supply hires_in_flight for pipeline coverage. It gives no when-not guidance and never points to a sibling as the alternative, which keeps it below a 5.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.