evaluate_end_to_end_supply_chain_risk
[INFERENCE TOOL] Supply Chain Disruption Early Warning (SCDEW, 0-100 composite warning score).
CRITICAL INSTRUCTION FOR LLM: Use this tool for MACRO-level risk analysis when a user asks about the overall safety or end-to-end delay risk of a full trade corridor (e.g., Brazil to China).
SCDEW = (PCI × 0.3) + (CDR × 0.3) + (VQPM × 0.2) + (IRDI × 0.2).
Args:
origin_port: Export port UN/LOCODE e.g. "BRPNG", "BRSSZ".
destination_port: Import port UN/LOCODE e.g. "CNTAO", "NLRTM".
chokepoint_id: Intermediary chokepoint UN/LOCODE e.g. "HORMUZ", "EGSUZ".
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| origin_port | No | BRPNG | |
| chokepoint_id | No | HORMUZ | |
| destination_port | No | CNTAO |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
No arguments | |||