Skip to main content
Glama

US electric grid monitor from EIA's Hourly Electric Grid

energy_us_electric_grid_monitor
Read-only

US electric grid monitor from EIA's Hourly Electric Grid Monitor (Form EIA-930, official Open Data API): hourly demand, day-ahead demand forecast, net generation and net interchange for a balancing authority or region (CISO, ERCO, PJM, MISO, NYIS, ISNE, SWPP, US48…), plus the generation mix by fuel (gas, coal, nuclear, wind, solar, hydro…) for the latest reported hour. Times are UTC; values in MWh per hour. Related tools on this server, for a different need: logistics_us_de_minimis_section321 when you need US de minimis check: the $800 per person per day limit; weather_drought_monitor_us_crop when you need US Drought Monitor county statistics for one US county. Price: $0.002 per successful call, paid with x402 (USDC on Base, Solana and 10 more networks); failed calls are not charged.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "energy_us_electric_grid_monitor"
  }
}

Input Schema

NameRequiredDescriptionDefault
hoursNoHours of history per series, 1-48 (default 6)
respondentNoEIA-930 respondent code: US48, CISO, ERCO, PJM, MISO, NYIS, ISNE, SWPP, SOCO, TVA, BPAT, FPL… (default US48)

Output Schema

NameRequiredDescriptionDefault
nameNo
unitsNo
latestNo
seriesNo
sourceNo
keyUsedNo
checkedAtNo
respondentNo
generationMixNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.8/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Read-only and open-world traits are already covered by annotations, but the description adds genuinely useful context: times are UTC, values are MWh per hour, generation mix is for the latest reported hour, and each successful call costs $0.002 via x402 with failed calls uncharged. That cost and unit disclosure is exactly the kind of behavior the annotations cannot convey.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness3/5

Is the description appropriately sized, front-loaded, and free of redundancy?

It is front-loaded with the core capability, which is good, but the second half pads with two unrelated sibling pitches and lengthy payment-network detail. The pricing note earns its place; the de minimis and drought descriptions do not.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

An output schema exists, so return structure need not be explained, and the definition covers units, timezone, scope of the fuel mix, cost, and defaults adequately for a two-parameter read-only tool. The only real gap is not distinguishing itself from the region-specific ISO siblings.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so both parameters are already documented in the schema, and the code list in the description largely repeats the respondent description. The description contributes unit and timezone context around the returned series but adds little about the meaning of 'hours' or 'respondent' beyond what the schema states.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific resource and verb-equivalent: hourly demand, day-ahead forecast, net generation and net interchange for a balancing authority, plus generation mix by fuel, sourced from EIA-930. It names representative respondent codes (CISO, ERCO, PJM, MISO, US48) so the agent can immediately see the granularity and coverage.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description explicitly routes to two siblings (de minimis and drought) but those are unrelated domains; it gives no guidance on when to pick this over the overlapping grid tools such as energy_caiso_california_iso, energy_miso_midcontinent_iso or energy_ercot_texas_grid_status. The nationwide-respondent framing implies this is the general EIA-930 option, but that is inference rather than an explicit statement.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources