Skip to main content
Glama

Energy Us Electric Grid Monitor

energy_us_electric_grid_monitor
Read-only

US electric grid monitor from EIA's Hourly Electric Grid Monitor (Form EIA-930, official Open Data API): hourly demand, day-ahead demand forecast, net generation and net interchange for a balancing authority or region (CISO, ERCO, PJM, MISO, NYIS, ISNE, SWPP, US48…), plus the generation mix by fuel (gas, coal, nuclear, wind, solar, hydro…) for the latest reported hour. Times are UTC; values in MWh per hour. Price: $0.002 in USDC per successful call, paid with x402 (Base, Solana or Arc); failed calls are not charged.

Input Schema

NameRequiredDescriptionDefault
hoursNoHours of history per series, 1-48 (default 6)
respondentNoEIA-930 respondent code: US48, CISO, ERCO, PJM, MISO, NYIS, ISNE, SWPP, SOCO, TVA, BPAT, FPL… (default US48)

Output Schema

NameRequiredDescriptionDefault
nameNo
unitsNo
latestNo
seriesNo
sourceNo
keyUsedNo
checkedAtNo
respondentNo
generationMixNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A3.8/5.0
Behavior4/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Beyond the readOnlyHint/openWorldHint annotations, it discloses payment terms ($0.002 USDC per successful call via x402 on Base, Solana, or Arc; failures not charged), time basis (UTC), and units (MWh per hour). Those are operationally important details an agent needs before calling; only rate limits and error behavior remain unstated.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Data content is front-loaded and the pricing/auth note is properly separated at the end. It's dense but every clause carries information; the code list is somewhat long but serves enumeration purposes.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present, 100% param coverage, and safety annotations already in place, the description fills the remaining gaps: data scope, time basis, units, and the paid-call model. An agent has everything needed to call it correctly.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters3/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so both parameters are already documented, making 3 the baseline. The description adds modest value by naming example respondent codes and clarifying that values are per balancing authority or region, but no extra syntax or edge-case guidance beyond the schema.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb set and resource: hourly demand, day-ahead forecast, net generation, net interchange, and fuel-mix generation for EIA-930 balancing authorities, with named codes (CISO, ERCO, PJM...). It is clear what data comes back, but it doesn't distinguish itself from regional siblings like energy_caiso_california_iso, energy_ercot_texas_grid_status, or energy_miso_midcontinent_iso, which cover overlapping territory.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

The description implies when it applies (US grid, hourly granularity, per balancing authority) but gives no explicit when-to-use vs when-not guidance or point to alternatives. An agent must infer that this is the multi-BA national tool rather than the single-ISO siblings.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources