Skip to main content
Glama

New York ISO real-time zonal electricity prices

energy_nyiso_new_york_grid
Read-only

New York ISO real-time zonal electricity prices from NYISO's public MIS files: the latest 5-minute LBMP ($/MWh) for each of the 15 zones and interfaces (CAPITL, N.Y.C., LONGIL, WEST...) with its loss and congestion components, plus the day's average so far per zone. Eastern time stamps; real-time market only (day-ahead not included). Takes about 11 s; allow a 30 s timeout. Price: $0.002 per successful call, paid with x402 (USDC on Base, Solana and 10 more networks); failed calls are not charged.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "energy_nyiso_new_york_grid"
  }
}

Input Schema

NameRequiredDescriptionDefault
zoneNoOptional zone name, e.g. N.Y.C., LONGIL, CAPITL, WEST

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.6/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only say readOnly and openWorld; the description goes well beyond by disclosing latency (~11 s), a recommended 30 s timeout, Eastern time stamps, and — critically for an x402 tool — a price of $0.002 per successful call across named networks with failures not charged. That cost and timing information is exactly the operational context an agent needs before invoking.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loaded with the resource and scope, then components, then operational constraints — a sensible order with no filler sentences. It is dense and the payment sentence is long, but each clause carries distinct information (cost, networks, failure policy) that an agent would otherwise have to discover.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

Return values are covered by the output schema, and the description still characterizes them (LBMP with loss and congestion components, per-zone daily average). With annotations, latency, pricing, timezone, and market scope all disclosed, an agent has everything needed to call this correctly on the first attempt.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is already 100% for the single optional `zone` parameter, so the baseline is 3. The description adds real value by stating there are 15 zones and interfaces and listing sample zone names, and the phrase 'for each of the 15 zones' implies the no-argument default (all zones) that the schema does not state.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a specific verb+resource+source: NYISO MIS 5-minute LBMP ($/MWh) per zone, with loss and congestion components plus a daily average. It even enumerates zones (CAPITL, N.Y.C., LONGIL, WEST) and states the scope boundary 'real-time market only (day-ahead not included)', so an agent can tell exactly what data this returns versus an ISO-status sibling.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

It gives clear usage context: real-time only, day-ahead not included, timestamps in Eastern time, and a 30 s timeout allowance for an ~11 s call. What it lacks is explicit routing to specific alternatives (e.g. the CAISO/ERCOT/MISO siblings), so an agent knows the scope but gets no named 'use X instead for Y' guidance.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources