Skip to main content
Glama

Green hydrogen levelized production cost

energy_hydrogen_spot_production
Read-only

Green hydrogen levelized production cost (LCOH, per kg) from an electrolyser: capital cost annuity, fixed O&M, electricity and water, from your inputs or defaults (system 55 kWh/kg, 1,000 €/kW installed, 8% WACC, 20 years, 4,000 full-load hours, 3% O&M). Without an electricity price it uses the latest EPEX SPOT Germany-Luxembourg day-ahead baseload price. A transparent calculator, not a traded hydrogen price. Price: $0.002 per successful call, paid with x402 (USDC on Base, Solana and 10 more networks); failed calls are not charged.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "energy_hydrogen_spot_production"
  }
}

Input Schema

NameRequiredDescriptionDefault
waccPctNoDiscount rate % (default 8)
kwhPerKgNoSystem electricity use, kWh per kg H2 (default 55)
capexPerKwNoInstalled electrolyser system cost, €/kW (default 1000)
omPctOfCapexNoFixed O&M, % of capex per year (default 3)
lifetimeYearsNoEconomic life, years (default 20)
electricityPriceNo€/MWh (default: latest EPEX DE-LU day-ahead baseload)
capacityFactorHoursNoFull-load hours per year, 500-8760 (default 4000)

Output Schema

NameRequiredDescriptionDefault
noteNo
sourceNo
omPerKgNo
currencyNo
checkedAtNo
lcohPerKgNo
capexPerKgNo
waterPerKgNo
assumptionsNo
electricityPerKgNo
capitalRecoveryFactorNo
electricityPricePerMwhNo
electricityPriceSourceNo

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4.6/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Goes well beyond the readOnlyHint/openWorldHint annotations by disclosing the default assumption set, the external data dependency (EPEX SPOT DE-LU day-ahead baseload), the pricing model ($0.002 per successful call via x402 in USDC on Base, Solana and 10+ networks) and the fact that failed calls are not charged. Those payment and fallback behaviours are exactly the operational context an agent needs before calling.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Two dense sentences, front-loaded with the definition and cost components before the defaults and payment terms. Every clause carries information, though the enumeration of all seven defaults plus the payment-network list makes it slightly heavy.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present, the return format need not be explained, and the description covers the remaining gaps: what is computed, which inputs default where, the external price fallback, and the billing model. Nothing material is missing for correct invocation.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is already 100%, so the baseline is 3; the description adds value by framing parameters as cost components (capital cost annuity, fixed O&M, electricity and water) and by restating the key default values in prose, plus the conditional behaviour of the electricityPrice parameter. It stops short of explaining the 500-8760 bounds for capacityFactorHours, which only the schema carries.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource: levelized production cost (LCOH, per kg) for green hydrogen from an electrolyser, and enumerates the cost components it aggregates. It also explicitly excludes a neighbouring concept ('a transparent calculator, not a traded hydrogen price'), so an agent cannot confuse it with a hydrogen spot-price tool.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines4/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Makes clear it works 'from your inputs or defaults' and spells out the fallback condition: without an electricity price it uses the latest EPEX SPOT Germany-Luxembourg day-ahead baseload. It does not name a sibling for the input-price lookup, but the when-to-use context for the calculation itself is unambiguous.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources