Energy Hydrogen Spot Production
energy_hydrogen_spot_productionGreen hydrogen levelized production cost (LCOH, per kg) from an electrolyser: capital cost annuity, fixed O&M, electricity and water, from your inputs or defaults (system 55 kWh/kg, 1,000 €/kW installed, 8% WACC, 20 years, 4,000 full-load hours, 3% O&M). Without an electricity price it uses the latest EPEX SPOT Germany-Luxembourg day-ahead baseload price. A transparent calculator, not a traded hydrogen price. Price: $0.002 in USDC per successful call, paid with x402 (Base, Solana or Arc); failed calls are not charged.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| waccPct | No | Discount rate % (default 8) | |
| kwhPerKg | No | System electricity use, kWh per kg H2 (default 55) | |
| capexPerKw | No | Installed electrolyser system cost, €/kW (default 1000) | |
| omPctOfCapex | No | Fixed O&M, % of capex per year (default 3) | |
| lifetimeYears | No | Economic life, years (default 20) | |
| electricityPrice | No | €/MWh (default: latest EPEX DE-LU day-ahead baseload) | |
| capacityFactorHours | No | Full-load hours per year, 500-8760 (default 4000) |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| note | No | ||
| source | No | ||
| omPerKg | No | ||
| currency | No | ||
| checkedAt | No | ||
| lcohPerKg | No | ||
| capexPerKg | No | ||
| waterPerKg | No | ||
| assumptions | No | ||
| electricityPerKg | No | ||
| capitalRecoveryFactor | No | ||
| electricityPricePerMwh | No | ||
| electricityPriceSource | No |