Skip to main content
Glama

European electricity market: day-ahead spot prices

energy_entsoe_transparency_eu
Read-only

European electricity market: day-ahead spot prices (EUR/MWh, 15-minute or hourly) for a bidding zone such as DE-LU, FR, NL, BE, AT, PL, DK1, NO2, SE3, IT-North, with min/max/average for the day, and optionally the cross-border physical flows (GW, positive = import) between a country and each neighbour. Data from ENTSO-E/SMARD as republished by Fraunhofer ISE's Energy-Charts API; licence string returned with each answer. Price: $0.002 per successful call, paid with x402 (USDC on Base, Solana and 10 more networks); failed calls are not charged.

Tool call template

This tool declares no required parameters. Add optional parameters from the input schema as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {},
    "name": "energy_entsoe_transparency_eu"
  }
}

Input Schema

NameRequiredDescriptionDefault
dateNoDelivery day YYYY-MM-DD (default: today)
zoneNoBidding zone, e.g. DE-LU, FR, NL, BE, AT, CH, CZ, PL, HU, DK1, DK2, NO1-NO5, SE1-SE4, IT-North, ES, PT (default DE-LU)
flowsNoOptional 2-letter country (de, fr, nl, at, pl…) for cross-border physical flows

Output Schema

NameRequiredDescriptionDefault

No arguments

Schema Changelog

Changes observed during successful MCP inspections.

  1. First observed

TDQS

A4/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Beyond the readOnlyHint/openWorldHint annotations, the description discloses the cost model ($0.002 per successful call), the payment rail (x402, USDC on Base/Solana and others), that failed calls are free, and that a licence string is returned with every answer. Cost and billing behavior are exactly the kind of operational context annotations cannot express.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Purpose, units, zone coverage and optional flows are front-loaded in one dense sentence, with sourcing and billing following. Nothing is redundant, though the parenthetical payment-network list is longer than it needs to be for tool selection.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness4/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With an output schema present, the description does not need to explain return values, and it still flags the licence string and the aggregation set. What remains thin is operational edge cases: whether today's day-ahead prices exist yet, timezone conventions, and behavior for an invalid zone.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema coverage is 100%, so the baseline is 3; the description earns an extra point by adding semantics the schema omits, notably the price unit (EUR/MWh), the 15-minute-or-hourly granularity, and the flow convention (GW, positive = import). It still does not clarify timezone/day-boundary behavior for the date parameter.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose4/5

Does the description clearly state what the tool does and how it differs from similar tools?

The description names a specific resource (day-ahead spot prices in EUR/MWh at 15-minute or hourly granularity), the zone identifiers it accepts, and the aggregations returned (min/max/average) plus optional cross-border flows. It also pins the source to ENTSO-E/SMARD via Fraunhofer ISE Energy-Charts, which implicitly separates it from EPEX-based siblings, though it never names the nearest competitor (energy_epex_spot_power_europe) explicitly.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines3/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Usage is conveyed indirectly through defaults ('default: today', 'default DE-LU') and the word 'optionally' for flows, so an agent can infer the common call shape. There is no explicit when-to-use/when-not guidance and no routing advice against the very similar EPEX spot-power sibling, so the agent must infer selection from the data source.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.

Resources