Calculate EVMS Metrics (CPI, SPI, TCPI, IEAC) & Generate IPMDR Format 5 Narratives
generate_evms_ipmdr_variance_analysisCalculate Earned Value Management System (EVMS) performance indices (CV, CV%, SV, SV%, CPI, SPI, TCPI_BAC, VAC, and 3-method Independent Estimate at Completion [IEAC]) across Work Breakdown Structure (WBS) Control Accounts under DFARS 252.234-7001/7002, FAR 52.234-4, and NDIA EIA-748-D (32 Guidelines), and generate ready-to-submit DI-MGMT-81861C IPMDR Format 5 Root-Cause Variance Analysis (isolating Rate vs. Usage and Schedule drivers), Critical Path impact assessments, and Control Account Manager (CAM) Corrective Action Plans with Estimated Completion Dates (ECDs). This is a read-only, stateless, non-destructive earned-value calculation and CDRL narrative generator (requires X-RapidAPI-Key; wbs_control_account_metrics_text accepts 20 to 45,000 characters, while variance_reporting_thresholds and evms_reporting_standard calibrate CDRL breach flags and EIA-748 Management Reserve / baseline integrity audits). Use this tool when computing WBS Control Account CPI/SPI/TCPI/IEAC metrics and drafting monthly IPMR/IPMDR Format 5 Variance Analysis CDRL narratives; use audit_dcaa_accounting_sf1408 instead for pre-award DCAA SF 1408 accounting system adequacy, or generate_quality_assurance_qasp for FAR 37.6 QASP and SLA surveillance matrices.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| evms_reporting_standard | No | Target EVMS reporting DID and standard (DI-MGMT-81861C IPMDR Format 5, DFARS 252.234-7002, and EIA-748-D 32 Guidelines; defaults to 'DI_MGMT_81861C_IPMDR_Format_5_And_EIA_748_D_32_Guidelines'). | DI_MGMT_81861C_IPMDR_Format_5_And_EIA_748_D_32_Guidelines |
| variance_reporting_thresholds | No | Contract CDRL variance reporting thresholds (e.g., +/- 10% and +/- $50,000 current period or cumulative CV/SV; defaults to 'Plus_Minus_10_Percent_And_50000_USD_Cumulative_Format_5'). | Plus_Minus_10_Percent_And_50000_USD_Cumulative_Format_5 |
| wbs_control_account_metrics_text | Yes | WBS Control Account metrics (BCWS/PV, BCWP/EV, ACWP/AC, BAC), technical/schedule/rate variance drivers, Management Reserve (MR) balance, and contract reporting thresholds (20 to 45,000 characters). |
Output Schema
| Name | Required | Description | Default |
|---|---|---|---|
| status | No | Execution status ('success'). | |
| evms_executive_program_summary | No | Program-level EVMS rollup, CPI/SPI/TCPI realism check, and EIA-748 compliance overview. | |
| ieac_and_baseline_integrity_audit | No | 3-method Independent Estimate at Completion (IEAC) comparison, Management Reserve audit, and EIA-748 baseline integrity controls. | |
| control_account_format_5_narratives | No | Ready-to-submit IPMDR Format 5 Variance Analysis narratives with Root Cause, Impact, and CAM Corrective Action Plans for each WBS Control Account. |