Update plan items
update_plan_itemsChanges an already shown plan without showing it again: replace a material or tool, set brand/price/link/quantity, add or remove a line, add a stage or items to a stage, rename. The open plan updates itself within seconds; a saved plan (save_plan) is updated too. view_id comes from the show_renovation_plan response.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"view_id": "<view_id>",
"changes": "<changes>"
},
"name": "update_plan_items"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| changes | Yes | ||
| view_id | Yes | view_id from the show_renovation_plan response |