submit_closeout_signoff
Send a project's closeout for sign-off: names the reviewers and moves the closeout from DRAFT to IN_REVIEW with one pending sign-off each, and tells each reviewer. Without reviewerIds the reviewer is the project owner (every plan); naming anyone else, or more than one, is designated multi-reviewer sign-off, a plan feature. Reviewers are active members of the workspace, never guests. Sending again while IN_REVIEW replaces the panel and clears the decisions. Lessons learned lock once it is sent. Refused on a closeout not started (CLOSEOUT_NOT_FOUND) or signed off (CLOSEOUT_LOCKED). Needs project.edit. Returns the record get_closeout_status returns.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "submit_closeout_signoff"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes | ||
| reviewerIds | No | Optional. User ids of the reviewers. Omitted, the project owner signs off. |