dismiss_risk
Mark a ProjectRisk as dismissed, with why: reason is MITIGATED, NOT_RELEVANT, DUPLICATE or OTHER (OTHER needs a note), and note is free text. Idempotent: dismissing an already-dismissed risk returns the existing row without re-writing. Also records implicit "DISMISSED" feedback against the risk category, which downweights that category in future detector runs. A person can restore a dismissed risk from the Risks tab.
Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| note | No | Why, in a few words. Required when reason is OTHER. | |
| reason | No | Why it is dismissed. | |
| riskId | Yes | Id of the ProjectRisk to dismiss. |