Skip to main content
Glama

create_project

Create a new, EMPTY project in the user's Onplana workspace: a named container with an optional start and end date and no tasks yet. Fits "start a project called X" or "set up a project for our office move" when there is no work to put in it yet. When the request includes the work itself ("plan a website launch", "set up a project with the tasks for X"), instantiate_plan creates the project and its whole plan in one call; calling this tool first and then instantiate_plan without a projectId produces two projects and leaves this empty one behind. An id from this tool passed to instantiate_plan as projectId fills this project with a plan instead. Tasks can also go in with create_task or bulk_create_tasks. The caller becomes the project owner. If start/end are omitted, the project runs from today to about 90 days out, adjustable later with update_project. In an organization that classifies its projects, type STRATEGIC is refused: a strategic project there starts as a proposal and is created when the proposal passes its gate. list_projects with search shows whether a similarly named project already exists. The result carries nextSteps: the follow-on calls with this project id already filled in. A project left at "created" is an empty project the user then has to fill by hand. The result includes url, a direct link to the project in Onplana. ALWAYS show that link in your reply: the user is working inside another app and has no other way to find what was just created.

Tool call template

Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.

{
  "id": 1,
  "jsonrpc": "2.0",
  "method": "tools/call",
  "params": {
    "arguments": {
      "name": "<name>"
    },
    "name": "create_project"
  }
}

Input Schema

NameRequiredDescriptionDefault
nameYesProject name, 2–255 chars.
typeNoSTRATEGIC or OPERATIONAL. STRATEGIC is refused in an organization that classifies its projects, where a strategic project starts as a proposal.
colorNoOptional hex color for UI display.
budgetNoOptional numeric budget in the project currency.
statusNoDefault PLANNING.
endDateNoOptional ISO 8601 end date (YYYY-MM-DD). Defaults to ~90 days after the start when omitted; when both are given it must be after startDate.
currencyNoISO 4217 currency code, 3 letters. Default USD.
startDateNoOptional ISO 8601 start date (YYYY-MM-DD). Defaults to today when omitted.
descriptionNoOptional description, up to 10000 chars.
idempotencyKeyNoOptional idempotency key. Pass a stable unique value (e.g. a UUID) to make this create safe to retry: calling again with the same key within 24h - even from a new session after a reconnect - replays the original result and creates no duplicate. Org-scoped; works across conversations.

Schema Changelog

Changes observed during successful MCP inspections.

  1. Changed4 schema fields changed
    • changedInput schema / properties / endDate / description
      Previous value: -"ISO 8601 end date (required, must be after startDate)."New value: +"Optional ISO 8601 end date (YYYY-MM-DD). Defaults to ~90 days after the start when omitted; when both are given it must be after startDate."
    • changedInput schema / properties / startDate / description
      Previous value: -"ISO 8601 start date (required)."New value: +"Optional ISO 8601 start date (YYYY-MM-DD). Defaults to today when omitted."
    • changedInput schema / properties / type / description
      Previous value: -"STRATEGIC or OPERATIONAL."New value: +"STRATEGIC or OPERATIONAL. STRATEGIC is refused in an organization that classifies its projects, where a strategic project starts as a proposal."
    • changedInput schema / required
      Previous value: -[
      -  "name",
      -  "startDate",
      -  "endDate"
      -]New value: +[
      +  "name"
      +]
  2. Added

TDQS

A4.8/5.0
Behavior5/5

Does the description disclose side effects, auth requirements, rate limits, or destructive behavior?

Annotations only declare the safety profile (readOnly=false, destructive=false, idempotent=false, openWorld=false). The description adds non-obvious behavior: the caller becomes owner, default date range of today to ~90 days, STRATEGIC being refused in classifying orgs, and that the result carries nextSteps and a url. That is substantial disclosure beyond what the annotations provide.

Agents need to know what a tool does to the world before calling it. Descriptions should go beyond structured annotations to explain consequences.

Conciseness4/5

Is the description appropriately sized, front-loaded, and free of redundancy?

Front-loads purpose and the key routing rule in the first two sentences, then layers prerequisites, side effects, and return-value handling. It is long, and a few clauses (e.g. restating the date default) echo the schema, but almost every sentence carries decision-relevant information.

Shorter descriptions cost fewer tokens and are easier for agents to parse. Every sentence should earn its place.

Completeness5/5

Given the tool's complexity, does the description cover enough for an agent to succeed on first attempt?

With no output schema, the description correctly describes the returned artifacts (`nextSteps`, `url`) and instructs the agent to surface the link. For a 10-parameter mutation tool it covers ownership, defaults, refusal cases, idempotency, and follow-on calls, leaving no critical gap.

Complex tools with many parameters or behaviors need more documentation. Simple tools need less. This dimension scales expectations accordingly.

Parameters4/5

Does the description clarify parameter syntax, constraints, interactions, or defaults beyond what the schema provides?

Schema description coverage is 100%, so the baseline is 3 and the schema already documents defaults for startDate/endDate and the STRATEGIC enum. The description reinforces the date-default behavior ('adjustable later with update_project') and the STRATEGIC refusal, but does not add much syntax the schema lacks.

Input schemas describe structure but not intent. Descriptions should explain non-obvious parameter relationships and valid value ranges.

Purpose5/5

Does the description clearly state what the tool does and how it differs from similar tools?

States a specific verb and resource ('Create a new, EMPTY project') and immediately qualifies scope ('a named container with an optional start and end date and no tasks yet'). The EMPTY emphasis plus explicit contrast with instantiate_plan lets an agent distinguish it from the sibling that also creates projects.

Agents choose between tools based on descriptions. A clear purpose with a specific verb and resource helps agents select the right tool.

Usage Guidelines5/5

Does the description explain when to use this tool, when not to, or what alternatives exist?

Gives concrete user phrasings for when to use it ('start a project called X') and when not to ('plan a website launch'), naming instantiate_plan as the alternative. It also warns about the specific failure mode (two projects, empty one left behind) and points to list_projects with `search` for duplicate checking.

Agents often have multiple tools that could apply. Explicit usage guidance like "use X instead of Y when Z" prevents misuse.

Try in Browser

Glama MCP Gateway

Add one secure layer between your agents and this server.