calculate_evm_history
EVM time-series for one project: each point carries the date, PV and AC (the S-curve). CPI and the estimates are in calculate_evm, which returns them null when no actual cost is recorded. Powers the S-Curve and trajectory analyses. Same access + plan gate as calculate_evm. points is empty when dataSource is "none" (no imported costs, rate card or default rate to price hours with), the same rule calculate_evm applies.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "calculate_evm_history"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| projectId | Yes |