calculate_evm
Earned Value Management report for one project as of a given date (default: now). Returns BAC, EV, PV, AC, CPI, SPI, EAC, ETC, plus EV/PV/AC in revenue currency when the org has billable rates. With no actual cost recorded, CPI, CV, EAC, ETC and VAC are null and actualCostRecorded is false: report them as N/A, not on budget. PREFER calculate_evm_history for time-series. Access: callers who may read the project cost: org OWNER/ADMIN, or budget.read at their project role (by default project OWNER and MANAGER). Plan gate: aiAdvanced.
Tool call template
Replace each placeholder with a value matching the input schema. Only required parameters are included; add optional parameters as needed.
{
"id": 1,
"jsonrpc": "2.0",
"method": "tools/call",
"params": {
"arguments": {
"projectId": "<projectId>"
},
"name": "calculate_evm"
}
}Input Schema
| Name | Required | Description | Default |
|---|---|---|---|
| asOf | No | ISO date; defaults to now. | |
| projectId | Yes |